Predictive Maintenance

Risk scoring based on service schedule + failure history

High Risk
0
Medium Risk
3
Low Risk
0
Total Equipment
3

Equipment Risk Register

TagEquipmentVesselSystemLast ServiceNext ServiceDaysFailuresDowntime (h)Cost (USD)RiskRisk Score
ME-01Main Engine — MAN B&W 6S50ME-C8.2MT Kalpana (Yard No. 445)Main Propulsion2024-06-102025-06-10366d OD226475,000Medium
65
AE-02Aux Generator #2 — Kirloskar KG2-750 / 750 kVAOSV Sagar Nidhi II (Yard No. 512)Auxiliary Power2024-09-152025-03-15453d OD218207,000Medium
64
FP-01Main Fire Pump — Mather & Platt / 400 m³/hrGRSE Fast Patrol Vessel P-450Fire & Safety2024-10-202025-04-20417d OD1658,000Medium
51

Failure History Log

EquipmentVesselDateDescriptionDowntime (h)Cost (USD)
Main EngineMT Kalpana (Yard No. 445)2023-04-02Fuel injector unit #3 seizure — carbon deposits. Replaced by Wartsila service team.18380,000
Main EngineMT Kalpana (Yard No. 445)2023-12-15Turbocharger surge — nozzle ring fouled. Cleaned and performance test passed.895,000
Aux Generator #2OSV Sagar Nidhi II (Yard No. 512)2024-01-20Drive-end bearing failure — overheating. Replacement by OEM (Kirloskar, Pune).14185,000
Aux Generator #2OSV Sagar Nidhi II (Yard No. 512)2024-08-05AVR instability during load test — governor hunting. Recalibrated.422,000
Main Fire PumpGRSE Fast Patrol Vessel P-4502023-11-10Impeller wear — flow rate reduced to 310 m³/hr (min 360). Impeller replaced.658,000

Risk score is calculated from: days to next service (overdue = high weight), number of past failures, and total historical downtime. Score 0–100 — High ≥70, Medium ≥40, Low <40. Scores update automatically as you add NCRs and equipment history.